The Starting Condition
The flat was substantially run down when we were appointed.
Nothing was worth keeping — this was a full refurbishment rather than a cosmetic refresh.
Every trade was involved, from renovation works and first-fix services through to the final decoration.

Before and After
Each pair is photographed from the same viewpoint, so the change is the only thing that moves.
Kitchen
Stripped back and replaced with a new kitchen, new services and new flooring.


Bathroom
A new bathroom with full plumbing renewal behind the finishes.


Living area
Replastered, rewired, refloored and redecorated throughout.


Scope of Works
Trovix delivered the complete refurbishment with one accountable team on site.
Delivered in Around Two Months
On site from May 2026 to July 2026.
- Weeks 1–2
Strip-out, removal of dated finishes and first-fix preparation
- Weeks 2–4
Electrical, plumbing and heating first fix
- Weeks 4–6
Plastering, flooring and kitchen and bathroom installation
- Weeks 6–8
Second fix, doors and joinery, decoration and final finishing
Before to After
Three stages of the same flat: the original condition, the strip-out and construction, and the finished refurbishment.


The Finished Flat








Project Details
Battersea, South West London
Flat
Premium full flat renovation
May 2026 – July 2026
New kitchen • New bathroom • Electrical works • Plumbing • Heating • Flooring • Plastering • Decoration • Doors and joinery • General internal finishing and modernisation
Why Choose Trovix
10-Year Structural Warranty
On eligible works, subject to the project contract
In-house team supported by specialist subcontractors
Coordinated and managed by Trovix throughout
Clear Timelines
Agreed schedules with weekly updates
An agreed contract sum
Detailed and based on the defined scope of works
5.0★ rated on Google
Consistently rated excellent
One accountable team
Trovix remains your single point of responsibility
Federation of Master Builders Member
Member No. 170642, vetted, work inspected, and independently verifiable.
Planning a Flat Refurbishment?
Tell us about the property and we will walk you through the scope, the sequence and the programme.