Bright open-plan living space with garden doors created by a Trovix extension in Isleworth, West London

Rear Extensions in London

Create a brighter kitchen-diner and garden-facing living space, with one accountable team coordinating your project.

Estimate My Rear Extension Cost
Completed Isleworth home with side extension and double-storey rear extension built by Trovix
Isleworth, TW7 — completed project

Completed project

Extending into the garden in Isleworth

A wider whole-home renovation that included a side extension, a double-storey rear extension, structural wall removals with new steels, and a loft conversion.

The client had secured design and planning before appointing Trovix, and we delivered the construction and coordination through to completion.

It shows the structural side of a rear extension at full scale: opening up the back of the house, carrying the loads and finishing the new space.

View the Isleworth project

What a rear extension gives you

A rear extension suits almost any London home with usable depth behind it — Victorian and Edwardian terraces with a small separate kitchen, 1930s semis with a run of small back rooms, and post-war houses with a plain rear elevation.

More usable space at the back of the house

A rear extension builds into the garden behind the house, which is usually the least constrained side of a London home and the simplest way to add ground-floor space.

Daylight where the house is darkest

Garden-facing glazing and rooflights over the new footprint bring light deep into the plan, including the middle room that previously had none of its own.

A ground floor that flows

Removing the original rear wall connects kitchen, dining and living space, so cooking, eating and family life happen in one room rather than three small ones.

A direct connection to the garden

Sliding or bi-fold doors across the new rear elevation make the garden part of the house for most of the year.

Three decisions that shape a rear extension

These are worked through on the site visit, before any drawings are produced, because each one affects the others.

  1. 1

    Depth, garden and daylight

    Depth is the first decision and it shapes everything else — cost, planning route, garden and light. Most London rear extensions take between three and six metres, which is a meaningful share of a short urban garden. Beyond a certain depth the retained middle room relies on borrowed light and rooflights, so we measure the remaining garden and peg the footprint out on site rather than relying on a plan drawing.

  2. 2

    Roof form and glazing

    A lean-to roof suits shallower footprints; deeper ones usually move to a flat roof with rooflights, which changes ceiling height and the feel of the room. Bi-folds open the full width but carry more frame; large sliders give a cleaner view and open less completely. On a south or west-facing elevation, solar-control glass, ventilation and an overhang are designed in rather than retrofitted as blinds.

  3. 3

    Structure, drainage and access

    The rear wall is almost always load-bearing, so the opening needs a beam sized for the span, padstones and piers, with foundations to suit the ground and any nearby trees. Most rear extensions also build over or beside a foul drain, which means a diversion or a build-over agreement with an accessible chamber. On a mid-terrace with no side gate, every delivery and load of spoil travels through the house, which changes the method and the programme.

How much does a rear extension cost in London?

Typical project investment: approximately £60,000-£120,000+ including VAT. Size, structure, glazing, location and fit-out can move the project outside this range.

Typical project investment: £60,000 – £120,000+ including VAT

What moves the figure most:

  • Depth and width of the new footprint
  • Foundation depth, set by ground conditions and nearby trees
  • Width of the structural opening in the rear wall and the steel it needs
  • Drainage — diverting an affected run or building over it
  • Roof form and the number of rooflights
  • Glazing choice, from standard doors to wide bi-folds or structural sliders
  • Planning route: permitted development, prior approval or a full application
  • Access, which on a mid-terrace with no side gate changes the whole method

Kitchen units, worktops and appliances are excluded unless specifically agreed for your project. Kitchen installation can be included by prior agreement.

Rear Extension Estimator

What could your rear extension cost?

Answer two quick questions. No email needed to see the range.

Question 1 of 2 · Property type

Planning and approvals

Some single-storey rear extensions qualify for permitted development, subject to the property and all relevant limits. Conservation areas have additional restrictions, and rights can also be removed by an Article 4 direction or a planning condition. We check the address and proposal before recommending a route.

Permitted development limits are measured from the original rear wall of the house, so if a previous owner already added a back addition, part of the allowance may already be used. Flats and maisonettes do not have householder permitted development rights.

Building regulations approval is a separate process, as are party wall notices and any water authority agreement for building over a drain. We coordinate these, but no route can be guaranteed in advance.

Living through the build

Many clients stay in the house during a rear extension, and a little planning makes that comfortable.

  • Occupied rooms, floors and the route through the house are protected before work starts.
  • Access, deliveries and waste routes are agreed in advance, including where there is no side gate.
  • A temporary kitchen is planned where the existing kitchen will be out of use.
  • Your project manager gives a weekly update, so you always know what happens next.

Discuss your rear extension

We respond within 24 hours, including weekends and holidays.

What happens next

  1. 01We review your details and respond within 24 hours.
  2. 02A short call to understand the property, the brief and the budget.
  3. 03If it looks right for both sides, we arrange a visit and set out the next steps.

Step 1 of 2 · Contact details

Common Questions

Rear extension questions, answered

Start your rear extension

Tell us about your home and what you want the back of it to do. We respond within 24 hours.

Estimate My Rear Extension Cost